More Stories






The Delaware River Joint Toll Bridge Commission has awarded a $6.7 million contract to design open-road tolling systems at five bridges linking New Jersey and Pennsylvania.
The commission voted this week to award the contract to GFT Infrastructure Inc. of Philadelphia.
The work will involve designing highway-speed electronic tolling facilities at the I-78, Easton-Phillipsburg (Route 22), Portland-Columbia, Delaware Water Gap (I-80) and Milford-Montague toll bridges.
According to the commission, the project includes plans for removing former cash toll booths, installing overhead tolling gantries and reconfiguring roadways to allow toll collection at highway speeds without requiring drivers to slow down or stop.
Cash collections ended at the five bridges between 2024 and 2025. Tolls are currently collected electronically through E-ZPass and toll-by-plate billing, but the former toll plazas remain in place.
Officials said design plans are expected to be completed by fall 2027. Construction contracts could then be awarded, with work taking place during 2028 and 2029.
The commission said the project is part of a broader effort to convert all former cash-collection toll locations in its system to open-road tolling. Similar systems are already operating at the Scudder Falls (I-295) Toll Bridge and the New Hope-Lambertville (Route 202) Toll Bridge.
According to the commission, more than 131.9 million vehicles crossed its bridges in 2025.